SURVEILLANCE CAMERA (MOI)
RADISSON BLU
Radisson Blu was one of the first projects to be commissioned under the newly implemented Ministry of Interior (MOI) regulations. This required the Radisson Blu premises to be integrated with surveillance to comply with standards.
Project Ref NO ABS-Q-012-1094-12 Date Started JULY 2012
Date Completed FEBRUARY 2013 Location SALWA ROAD, DOHA, QATAR
Employees 04 ENGINEERS,06 TECHNICIANS,22 LABOURS
SOLUTIONS
Adax proposed the estimated surveillance Camera solutions to the premises taking into consideration the use and purpose of the installation. This project was completed as per MOI standards in all aspects of its design and implementation. we installed 356 cameras in the premises with a finished product that included storage and connectivity to a detailed finish. Radisson has since trusted our solutions and services.
+ -
THERMAL CCTV PORT SURVEILLANCE
QATAR PORT MANAGEMENT COMPANY (QPMC/MWANI)
QPMC is building one of the three ports in the country with hi tech solutions and system integration. Surveillance, structured cabling and other solutions were required by QMPC for a standardized requirement of a complete equipped port. The port required solutions to assess ships entering and leaving the port plus other solutions.
Project Ref NO ASS/PF/167/15 Date Started JANUARY 2016
Date Completed ON-GOING Location AL RUWAIS, QATAR
Employees 03 ENGINEERS 05 TECHNICIANS 45 LABOURS
SOLUTIONS
Adax designed a project which included special surveillance system with cutting edge solutions to be able to get the best up to date information to the port authorities at the earliest time scale. Thermal cameras were installed in the most points of traffic control with installation of 86 other surveillance cameras that were anti-shake technology and Pan Tilt Zoom (PTZ) technology used to improve the capturing of images in a windy scenario. Adax has installed a solution with high standards using some of the best resources available in the field of security and surveillance.
+ -
UNIVERSAL ACCESS CONTROL
UNITED DEVELOPMENT COMPANY (UDC)
UDC has developed over 40 buildings at the Pearl which it intends on having a well-controlled centralized access control system with the highest security standard. This integration required security solutions for a wide variety to act together in creating a complete solution.
Project Ref NO ASS/PF/047/15 Date Started JUNE 2015
Date Completed ON-GOING Location PEARL, DOHA, QATAR
Employees 02 ENGINEERS, 04 TECHNICIANS, 26 LABOURS
SOLUTIONS
Adax proposed a card based universal access control of the project with over 400 doors. There were 37 long range readers for barrier entry installed, which were acting accordingly, as the whole system was integrated into one system. Access control interfaced with lift ensured that security and access control at all levels of operations and in all parts of the building were protected. This is one of the most detailed project Adax has worked in with some of the cutting edge technology used for the project.
+ -
CONSOLIDATED TIME ATTENDANCE
VODAFONE
Vodafone operates in many locations across the regions with limited control and monitoring from the head office. They required a system which is able to centralize the attendance of all employees across the different locations..
Project Ref NO ASS/PF/044/16 Date Started MARCH 2016
Date Completed APRIL 2016 Location ALL SHOP AND SHOPS,DOHA, QATAR.
Employees 01 ENGINEERS, 02 TECHNICIANS
SOLUTIONS
A centralized system was designed by Adax to implement a system that is able to control and monitor all Vodafone shop and shop locations across the region, presently Adax has implemented 10-time attendance systems and other solutions to each of its outlets and Adax continues to work with Vodafone on expanding its solutions in the newly appointed outlets. Installation of time attendance system has improved the productivity of the shop and shops.
+ -
GATE BARRIER INTEGRATION
The Inner Doha Re-Sewerage Implementation Strategy (IDRIS)
Al shaiya strabag, Hochtief and Petro-Serv (SHP) Is working on one of the largest project in Qatar, (IDRIS). SHP required a centralized access control system to help them monitor and control access to the 7 different entry levels on the premises.
Project Ref NO ASS/PF/032/16 Date Started FEBRUARY 2016
Date Completed ON-GOING Location AL WUKAIR, QATAR.
Employees 03 ENGINEERS,05 TECHNICIANS, 15 LABOURS
SOLUTIONS
The centralized access control system provided by Adax is connected to the SHP head office that enables a very controlled system to work with the implementation of RFID cards. The gate barriers in the SHP locations are designed to restrict access and in a method which operates on its own with the defined specification for the locations as demanded by the client.
+ -
AUTOMATED BOLLARDS
RUSSIAN EMBASSY
Increase in the world treats and other security reasons acquired the Russian embassy in Doha to take steps to improve its security measures within the premises and one such measure was the need to restricted unauthorized access of vehicles entering or exiting the premises.
Project Ref NO ABS-341214 Date Started DECEMBER 2014
Date Completed OJANUARY 2015 Location PEARL, DOHA, QATAR
Employees 02 ENGINEERS, 01 TECHNICIANS, 05 LABOURS
SOLUTIONS
Adax proposed a card based universal access control of the project with over 400 doors. There were 37 long range readers for barrier entry installed, which were acting accordingly, as the whole system was integrated into one system. Access control interfaced with lift ensured that security and access control at all levels of operations and in all parts of the building were protected. This is one of the most detailed project Adax has worked in with some of the cutting edge technology used for the project.
+ -
FLAP BARRIER ACCESS CONTROL
QATAR CHARITY
Qatar Charity with its growth and development in recognition as a world charity organization needed to upgrade its security standards to ensure the restriction of unauthorized access to a system that is able to work both with foolproof security and convenience.
Project Ref NO ASS/PF/010/15 Date Started APRIL 2015
Date Completed MAY 2015 Location AHMED BIN HANBAL ST, DOHA, QATAR.
Employees 02 ENGINEERS, 05 TECHNICIANS
SOLUTIONS
Adax provided Qatar Charity with the proposal of a Flap Barrier System with biometric and card solution integration. This enabled quick access and a strong system which is able to physically stop unauthorized entry. The fingerprint authorization worked in part with the card system, Qatar charity had very positive reviews of the access controlled installed. The Flap Barriers used were some of the fastest and smoothest flap barriers operating with the highest quality, ensuring less maintenance involved.
+ -
LONG RANGE READER
URBACON TRADING AND CONTRACTING (UCC)
UCC is being one of the largest construction firms in the country acquired a hi-tech access control system that will provide access to their parking facility with the least hassle.
Project Ref NO ASS/PF/112/15 Date Started MARCH 2016
Date Completed ON-GOING Location LUSAIL, QATAR.
Employees 02 ENGINEERS, 02 TECHNICIANS, 04 LABOURS
SOLUTIONS
A long range reader is the solution Adax proposed to UCC to help them achieve an access controlled parking system. The use of long range reader is a non-contact technology that will read an RFID card from a distance and is able to provide quick access to the facility. Adax installed Gate Barriers integrated with long range readers for this project.
+ -
TURNSTILES
QATAR RAIL (SOQ JV)
Samsung C&T Corporation - Obrascon Huarte Lain S.A (OHL) - Qatar Building Company (SOQ JV) is a part of the Q-Rail project. SOQ JV needed a strong solution in access control to help manage a large team. A system which is able to control and monitor the team working in those working conditions.
Project Ref NO ASS/PF/039/15 Date Started APRIL 2015
Date Completed AUGUST 2015 Location MSHEIREB, QATAR
Employees 03 ENGINEERS, 04 TECHNICIANS, 08 LABOURS
SOLUTIONS
Adax designed a system integrating many solutions to work together in creating a well-controlled and managed access control system which is able to generate various reports. The Turnstiles Solution acts a centralized access control system that works with smart cards. This solution helped SOQ JV to achieve a productivity in greater control in access plus management decisions, payroll with real time data and a hi-tech head count system.
+ -
PARKING GUIDANCE
QATAR UNIVERSITY
Qatar University is part of the largest growing educational institutes in the country with the requirement to have a parking management system that would enable students and other stakeholders have a better time allocation in the car parking process.
Project Ref NO ASS/PF/061/15 Date Started APRIL 2015
Date Completed AUGUST 2015 Location AL TARFA, DOHA, QATAR.
Employees 02 ENGINEERS, 04 TECHNICIANS, 10 LABOURS
SOLUTIONS
A car parking system of 355 slots were design and present to the Qatar university management with a detailed access control system and a well-defined parking guidance solution that will help reduce the time spent on finding a parking space. Adax successfully implemented this solution with sensors, displays and a centralized system which works cohesively with the integration of hardware and software in creating an organized Parking management system.
+ -
PARKING TICKETING MACHINE
Q MALL
Q Mall as a newly built shopping complex required many security and business solutions to create a state of the art environment in and around the premises. Solutions for operations, security, management, surveillance, cabling and a well-managed parking management system.
Project Ref NO ABS-310813 Date Started NOVEMBER 2013
Date Completed NOVEMBER 2015 Location AL GHARAFA, DOHA, QATAR.
Employees 03 ENGINEERS, 04 TECHNICIANS, 21 LABOURS
SOLUTIONS
Adax design and proposed a very hi-end solution integration with some of its core products and services in creating an advanced system. Adax worked on the parking management and ticketing solution of Q Mall, the whole process of parking management was implemented with the specification of the clients. The use of camera, access controls, sensors and other solutions were integrated in completing a complete solution. MOI and ISO standards were followed in the implementation of solutions throughout the facility.
+ -
VIDEO WALL
Paris Saint-Germain F.C. (PSG)
PSG as a marketing campaign for their first outlet in Qatar required a state of the art high definition display system with surveillance solutions in one of the biggest and most visited malls in the country. A solution both with a creative display and sustainable security solution.
Project Ref NO ABS-201213 Date Started DECEMBER 2013
Date Completed JANUARY 2014 Location VILLAGGIO MALL, DOHA, QATAR.
Employees 02 ENGINEERS, 01 TECHNICIANS, 04 LABOURS
SOLUTIONS
Adax design a cutting edge display solution using one of the most advanced display screens in the market with some high quality products to create a stand out solution. The video wall project is displayed in the PSG store in village implementing a solution of four large 60-inch LCD video wall Monitors that accounts to a diameter of 120-inch. This solution had positive reviews from the Qatar Sports Investment which is the organization that handles PSG
+ -
UNIVERSAL AUVIO VISUAL SYSTEM
NOBU RESTURANT- FOUR SEASONS
Nobu restaurant is a subsidiary of four seasons hospitality group and this establishment acquired a complete solution for their prestigious restaurant with regard to Audio Visual system, access control, CCTV and Public Addressing system.
Project Ref NO ABS-Q-012-1069-12 Date Started JANUARY 2013
Date Completed MARCH 2015 Location DIPLOMATIC ST, DOHA, QATAR.
Employees 03 ENGINEERS, 06 TECHNICIANS, 12 LABOURS
SOLUTIONS
A state of art solution with the best products and a high end solution with a complete detailed integration with some of the most sophisticated devices was proposed by us for this requirement. Having received this contract designed a video conferencing to be a part a meeting and conferencing room. Adax worked along with other solution providers at Nobu in creating an advance solution.
+ -
AUDIO CONFERENCING SYSTEM
SAMSUNG COOPERATION
Samsung Cooperation required a state of an audio conferencing system which is able to cover the allotted space with clear and advanced audio conferencing system.
Project Ref NO ASS/PF/154/15 Date Started DECEMBER 2015
Date Completed JANUARY 2016 Location UMM A HOUL, WAKRA, QATAR.
Employees 02 ENGINEERS, 02 TECHNICIANS
SOLUTIONS
Adax designed a proposal to install 30 audio systems in the hall, the structure was integrated into a centralized audio conferencing system which would be record and enhance the audio experience. This project was successfully completed with Adax being able to receive positive reviews from the tech giant.
+ -
VIDEO INTERCOM INTERGRATED
QATAR INVESTMENT AUTHORITY (QIA)
QIA as a procedure to strengthen its security measures required a professional security solutions company to check into their premises and access the possible improvements for the premises from Entrance to the operation levels in all aspects of the facility.
Project Ref NO ABS-490613 Date Started JUNE 2013
Date Completed JULY 2013 Location DIPLOMATIC ST, DOHA, QATAR.
Employees 01 ENGINEER, 02 TECHNICIANS
SOLUTIONS
Adax was able to provide QIA an appropriate proposal with detailed integration and a customized system that allows QIA premises to be well managed with an efficient and effective security system in place. Many solutions were provided by attacks on this proposal, however the stand out solution was the Video Intercom System, which works with entry level of the premises. The video intercom creates a digital communication between the outsider and security personals to provide access to the facility. This improved the access and an enhancement in security measures considering the involvement of QIA in the Qatar economy.
+ -
SMART BOARD UPGRADED
EDISON ACADEMY
The Edison academy education institute as a part of development in their teaching habits and to improve the culture within the institute acquired a solution that could work towards greater interaction between the teachers and students.
Project Ref NO ABS-180814 Date Started AUGUST 2014
Date Completed DECEMBER 2014 Location DAHL AL HAMAM, DOHA, QATAR.
Employees 01 ENGINEERS, 03 TECHNICIANS
SOLUTIONS
The best interaction solution that could be provided for an educational institute to improve its student teacher interaction was the introduction of smart boards. Adax proposed the installation of 80 interactive smart boards a cost effective solution. Edison school since the installation of this device has witnessed a good improvement in the interaction aspects of teaching. Adax has also been part of the smart display installation which adds greater value to an organization which acquire a higher level of interaction.
+ -
STRUCTURED CABLING
ADVANCED PIPES AND CAST COMPANY (APC)
APC is a part of the AL Faizal holding. APC new plant in mesaieed acquired a structured cabling that is able to provide connectivity across is its premises. APC acquired other security solutions to be integrated with the date networking process.
Project Ref NO ASS/PF/025/15 Date Started AUGUST 2013
Date Completed AUGUST 2014 Location MESAIEED INDUSTRIAL CITY, QATAR.
Employees 02 ENGINEERS, 03 TECHNICIANS, 10 LABOURS
SOLUTIONS
Structured cabling services for a structure as this, acquires time and high quality products which are able to ensure the productivity of the premises. Adax created an efficient design for the structured cabling process while integrating some of the other solutions of Adax. Taking over a year Adax was able to complete this project successfully with utmost perfection in all of its solutions backed with a strong structured cabling process.
+ -
CENTRALIZED WI-FI SOLUTION
QATAR LUXURY GROUP (QLG)
QLG is one of the prestigious company introducing international fashion to the local market. Brand names in hospitality, fashion and lifestyle. Their premises required a centralized wifi solution to be installed with the idea of providing access to the internet in all their floors.
Project Ref NO ABS/Q/012/1110/12 Date Started FEBRUARY 2012
Date Completed APRIL 2012 Location AL MUNTAZAH, DOHA, QATAR.
Employees 01 ENGINEERS, 04 TECHNICIANS
SOLUTIONS
Adax had worked on QLG projects implementing Wi-Fi solution to the whole of its premises. Adax had connection in all the floors of the QLG premises and positive reviews were received after the completion of the project. The design was simple and as a result the wiring process was reduced. The solution was able to provide QLG with a completely wireless internet connectivity.
+ -
CANTEEN MANAGEMENT SYSTEM
BOOM CONSTRUCTION
A situation of an uncontrolled canteen management prevailed in the boom construction which required a greater control in the canteen to ensure that the third part food company is able to cater their staff efficiently and that they are able to control and monitor the process within the food schedule.
Project Ref NO ASS/PF/051/16 Date Started JANUARY 2016
Date Completed MARCH 2016 Location AL NASR, DOHA, QATAR.
Employees 01 ENGINEERS, 02 TECHNICIANS
SOLUTIONS
Adax implemented a system of canteen management, which required checking in with the use of smart card to generate head count and other information boom construction is able to use in decision making with regard to canteen management. The canteen management system gave an exact count of food consumption that reduced the food cost and improved the efficiency within the canteen premises. Adax has since worked with Boom construction in implementing other solution to improve aspects of business operations.
+ -
INTRUDER ALARM
MALABAR GOLD
The opening of a Jewellery outlet will require certain MOI regulations to be followed and in the case of Malabar gold it needs a solution to intergrate its security breach to security services as a part of safety procedure.
Project Ref NO ABS-Q-012-1117 Date Started APRIL 2015
Date Completed JUNE 2015 Location AL GHARAFA BRANCH, DOHA, QATAR.
Employees 02 ENGINEERS, 04 TECHNICIANS
SOLUTIONS
Intruder Alarm proposed by Adax was one of its kind, motion sensors and other solutions were integrated to implement a system that works together in cases of a security breach. This project has been successfully implemented with testing and quality check at every point of the implementation process with a report generated at every test and possible point of breach, to ensure the quality of the intruder alarm system with a high profile financial support.
Goto Top